Monday, February 23, 2015
Drywall
The delay in the delivery of the shower has had a bit of a domino effect with both plumbing and drywall fortunately we are now past that. The drywall crew did a great job today, all the board is up and taped, finish coat and polish coat complete by Friday. We removed about 95% of the old Poly B pipe and replaced it with PEX pipe for all water supply lines. The tank-less Hot water system has been started and will be complete by Friday. The finishing Carpenter will start the trim work by Friday and the Painter will should be complete Wednesday next week in time for the new cabinets. Tile work will start as soon as the painter has the second coat on plate.
Saturday, February 7, 2015
Demolition
Good progress over the past 3 days, all of the cabinets, and flooring were removed. The tile was removed from the en suite tub and stairs as well as the full bath around the tub. The wall creating the new custom tile shower in the en suite and the walls for the new full bath were also framed.
There is usually a surprise or two in any renovation, the one surprise we found so far was two hidden electrical junction boxes behind the en suite shower! Looks like someone did a previous renovation at some time and failed to do it right. Our electrician pulled an electrical permit and will make it right.
There is usually a surprise or two in any renovation, the one surprise we found so far was two hidden electrical junction boxes behind the en suite shower! Looks like someone did a previous renovation at some time and failed to do it right. Our electrician pulled an electrical permit and will make it right.
Subscribe to:
Posts (Atom)