Good progress over the past 3 days, all of the cabinets, and flooring were removed. The tile was removed from the en suite tub and stairs as well as the full bath around the tub. The wall creating the new custom tile shower in the en suite and the walls for the new full bath were also framed.
There is usually a surprise or two in any renovation, the one surprise we found so far was two hidden electrical junction boxes behind the en suite shower! Looks like someone did a previous renovation at some time and failed to do it right. Our electrician pulled an electrical permit and will make it right.
No comments:
Post a Comment