Monday, March 16, 2015

Preparation & Flooring

Lots of prep work to ensure the floor tiles have the right base. All of the old holes in the floor from heat registers, toilets, bidet and plumbing pipes were repaired then leveled with flooring compound.  Orange Ditra mat was used over the entire floor this provides an uncoupled flooring system and eliminates the possibility of any cracking of tiles or grout lines.  The tile work on the flooring is now complete, we expect another week for the wall tiles.  Cabinets were delivered and will be installed Monday March 16.  All of the hard surface counter tops and and extra pieces for the shower were ordered, big changes by the end of the week.